Ilham, Habir and Tukimun (2025) “An Integrated Critical Path Method and PERT Approach for Schedule Performance Evaluation of Drainage Construction Projects”, International Journal of Industrial Engineering, Technology & Operations Management, 3(2), p. e114. doi: 10.62157/ijietom.v3i2.114.