Ilham, Habir, and Tukimun. 2025. “An Integrated Critical Path Method and PERT Approach for Schedule Performance Evaluation of Drainage Construction Projects”. International Journal of Industrial Engineering, Technology & Operations Management 3 (2):e114. https://doi.org/10.62157/ijietom.v3i2.114.