Ilham, Habir, & Tukimun. (2025). An Integrated Critical Path Method and PERT Approach for Schedule Performance Evaluation of Drainage Construction Projects. International Journal of Industrial Engineering, Technology & Operations Management, 3(2), e114. https://doi.org/10.62157/ijietom.v3i2.114