[1]
Ilham et al. 2025. An Integrated Critical Path Method and PERT Approach for Schedule Performance Evaluation of Drainage Construction Projects. International Journal of Industrial Engineering, Technology & Operations Management. 3, 2 (Dec. 2025), e114. DOI:https://doi.org/10.62157/ijietom.v3i2.114.